top of page

Engineered Lift Planning

We develop cost-effective, and reliable engineered lift plans for all types of load handling activities:

​

  • Steel, Prestressed Concrete and Curved Girder Erection​

  • Bridge Demolition & Deck Removal

  • Pre-fabricated Bridge Units

  • Removal/Replacement of Heavy Equipment​​

  • Erection of Overhead Catenary Systems (OCS)

  • Critical Lifts, including: Heavy Lifts, Tandem Lifts, Tailing Operations

  • Rebar Cage Erection

​

"If you fail to plan, you are planning to fail"

​

We also provide constructability review during pre-design, and peer review during construction.

Builder on the Scaffolding

Structural Design of Temporary Works

For the safe and efficient execution of a construction project, temporary works engineering is just as important as the permanent design. However, the design of temporary works is rarely included in contract drawings and oftentimes passed off as "Contractor Means and Methods."

​

We design temporary works that provide stability, access, and efficiency during the construction process, and ensure that the final structure can be built as planned.

ABC with SPMTs in Evanston

Accelerated Bridge Construction

While ABC projects may vary in their delivery method, all share a common goal – to complete a bridge replacement at a far quicker pace than typical, traditional methods. We are experienced at keeping up with the pace, and delivering solutions that meet the demands of the schedule and engineering requirements.


We have worked on several ABC projects that have utilized SPMTs, lateral-slide methodologies and pre-fabricated bridge units [PBUs], and are capable of providing all aspects of the engineering associated with an ABC delivery.

Currently licensed in: Connecticut, Indiana, Massachusetts, New Jersey, New York, Pennsylvania, and Virginia.

If you don't see the state you are looking for, let us know! Depending on the project, we may still be able to help!

bottom of page